THC Alaska, Long Lead Times Are A Thing Of The Past.

6293828e30fb025780ee2960

Trusted by

gillette (2)
graphicpkg (1)
Lacas-Coffee-NJ (1)

What Can We Help You With?

This field is for validation purposes and should be left unchanged.
Name*

* indicates required fields

Industry: Cannabis Products
Challenge: Long lead times and high minimum order quantities for pre-printed labels
Solution: On-demand labeling with Epson ColorWorks C7500 printers
Results: Increased flexibility, reduced costs, and total control over product labeling


Challenge

THC Alaska was relying on pre-printed labels for its product line. This process created significant challenges with:

  • Long lead times – slowing down product availability
  • High minimum order requirements – tying up cash flow and creating excess inventory
  • Lack of flexibility – making it difficult to adapt to new product variations or regulatory changes

The inefficiencies were hurting their ability to respond quickly to market demands.


Solution

PaladinID worked closely with THC Alaska to understand their operations and recommend a labeling system tailored to their needs. After reviewing several options, we suggested the Epson ColorWorks C7500 color label printer.

This printer offered:

  • High-speed, high-volume performance – perfect for their production requirements
  • Full-color, on-demand printing – eliminating the need for pre-printed inventory
  • Unmatched flexibility – allowing them to print exactly what they need, when they need it

We installed the C7500 printers, provided training, and ensured a smooth transition to their new on-demand labeling system.


Results

After implementation, THC Alaska reported immediate benefits:

  • Total flexibility – the ability to print any design, anytime
  • Cost savings – no more waste from unused pre-printed labels
  • Faster time-to-market – no waiting on suppliers for label deliveries
  • Improved operations – they could easily adjust labels to meet product or compliance changes

The customer told us they couldn’t imagine how they had functioned without this solution before. The Epson C7500 completely transformed their labeling process, making it both efficient and scalable.


👉 Is your business struggling with long lead times and high minimums for labels? PaladinID can help you move to an on-demand labeling system that saves money, improves flexibility, and keeps your products moving. Call us today at 888.972.5234 to schedule a Discovery Call below.

icon-square-01
P-ID-f2

Got Labeling Questions? Our AI Assistant Has Answers - Chat Now!

Get Help With Your Next Label Project

We have over 35 years of providing exceptional service and labeling products to the world.  Take the first step to an easy, stress-free solution for your label needs by contacting us.

Schedule a call below or email [email protected]

SCHEDULE A CALL WITH A LABEL EXPERT